Setting up utilities in Mallorca: a practical handover plan

Electricity, water, internet and everyday services when you move into a property.

Home interior before setting up services, editorial illustration
In this guide

Utility arrangements vary between buildings and municipalities. Treat the following as a checklist of questions rather than a set of fixed administrative requirements.

Electricity

Ask who currently holds the supply contract, how the meter is identified and whether the supply is active. Photograph meter readings on handover and verify required documents with the provider.

Water and waste

Water supply and waste collection can be managed differently depending on the municipality and building. Ask the owner, administrator or provider about account details, billing and collection instructions.

Internet and mobile

Check service availability at the precise address, not only the municipality. Thick stone walls and some rural locations can affect installation options and indoor mobile reception.

Keep an organised record

Store the dates of contract changes, meter identifiers, service contacts and copies of confirmations in one secure place. Never send full personal identifiers to an unverified intermediary.

Do not assume every account transfers automatically

Keep dated meter photographs and the confirmation from each provider. Contract changes and appointments vary by supplier, municipality and the condition of the property.

THE TAKEAWAY

Your practical checklist

0 of 4 completed

Tick items as you go. This checklist is kept only in this browser tab and is cleared on reload. You can print the guide for an offline copy.

QUICK ANSWERS

Questions worth asking

Is there one utility process for every property?

No. Supply status, provider, location and the type of building can change the steps required.

PALMA ARRIVAL / PRACTICAL GUIDANCE, NOT INDIVIDUAL PROFESSIONAL ADVICE✦